Subfloor Steps

With the help of my dad’s friend and his jeep with a front hitch, my lovely trailer has been maneuvered out of our turn-around spot and onto the lawn where I’ll be building. We had it further away from the neighbour’s fence for the insulation spraying, and then didn’t get around to moving it until last week. It was convenient to have it closer to the garage to carry plywood and tools back and forth for the floor, but I couldn’t block the turn-around spot forever. Besides, I’ll be building the walls on the ground and then I’ll have people over to help move them around.

And it's a shady spot!

And it’s a shady spot!

I still need to put the jacks down and level it, but I’ve at least got a lock on it now.

Before I start to forget what I did, I want to share the steps I took up until this point. Here is the beginning of the 3rd phase of my steps list:

Phase 3

Do your own research as well though; I can’t guarantee anything I do is the right thing to do. I’ve never built a house before!

I love lists, so here’s one with all the tools and things I used for the first part of phase three:

– tarp

– bungee cords

– Shop Vac

– rope

– utility knife

– 4 foot metal ruler

– right angle metal ruler

– speed square

– carpenter’s square

– mini broom

– chalk box

– chalk

– tool belt

– clamps

– circular saw

– jigsaw

– drill

– impact driver

– extension cord

– measuring tape

– pencil

– gloves

– eye protection

– ear protection

– caulking gun

– awl

– wrench

– patio stones

– saw horses

– hammer

– and a camera!

Before I share how much time has been put into this build so far, here’s two tips from my mum:

1. Have a hammer and a 2×4 handy to hammer your T&G into place, like giant floor boards.

2. Have something soft, like a towel or a foam square, to put under your knees while you’re drilling into your trailer for hours.

So, I’ve started a time log. I could never guess how long I’ve spent online researching tiny houses, but I will be counting the hours I build. I’m also trying to keep track of some hardware store time and time put in by other people.

So far, I’ve spent 11 total hours drying out the trailer after rain and putting the tarp over it.

Mum and Dylan put in 3.5 hours between each other to help with the tarp and clean-up.

I worked on the subfloor for 42 hours total, and Dylan and Mum put in 40 hours between the two of them. With the walls, I’ll be working alone more often, but with the subfloor I needed help for almost everything. Plywood is bigger than me 😛

The insulation took an hour and 20 minutes. The welder took two hours.

I’ve spent 10.5 hours in hardware stores, and Dylan and Mum have put in 13 hours. I’ve always had one of them with me, and one time I had both of them with me.

So, I’ve put in 63.5 hours in the past month. The subfloor took 82 hours of work, if you don’t count clean-up or hardware stores. I’m telling you, those screws take SO LONG! Of those 82 hours, more than half of them were spent just on screwing.

Now, onto the walls!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Quotes

"It takes as much energy to wish as it does to plan." - Eleanor Roosevelt

"It is not because things are difficult that we do not dare. It is because we do not dare that they are difficult." - Seneca

"Have nothing in your house that you do not know to be useful or believe to be beautiful." - William Morris
%d bloggers like this: