Stuck and Stressed

I wish I had progress to report, but the trailer is still wall-less and summer is getting away from me.

Work, the weather, the engineer, the roofing, and calculations kept me from building before leaving for vacation for two weeks. One of my coworkers was on vacation for all of July, so I was working a lot, and then it seemed whenever I had a day off, it was raining. Now that I’m back, I still don’t have anything concrete from the engineer because she was out sick while I was gone.

I haven’t been able to confidently start on the walls for several reasons. First, I had to figure out how high I can build the framing without the ridge cap of my roof exceeding 13’6″. In the design stage, I appreciated the creative challenge of making my house fit into road restrictions. However, trying to get my house to be as tall as possible without going over has proven to be annoying and unusual. I don’t have any examples to go by because I’m working backwards from a specific height, whereas with normal houses, it doesn’t matter how tall they end up.

Then I found out that the only location in the Maritimes that sells the roofing I want, Onduvilla, is going to discontinue selling it. I hadn’t planned on ordering my roofing yet, but I wanted to get it before they stopped selling it! Since I want a special-order colour, I was told it could take 8 weeks or more, so all the more reason to order it right away. I was stressing for weeks about calculations and the framing and the roofing, and finally ordered the roofing the day I left for vacation. It arrived the day after we got back. So much for 8 weeks! I probably could’ve saved myself some stress by not worrying so much, but at least I have it now. It was exciting to go pick it up and see the orange colour in person. The house is going to look so good when it’s done!

A friend of my dad’s also gave me some leftover flooring for free:

I’m not sure if I’ll use it, but it’s a lovely medium brown that I would’ve picked for myself šŸ™‚

I’m having a hard time balancing the build with a social life, but I’m STILL emailing back and forth with the engineer so I can’t do much. I should have her okay in the next couple days though. This week coming up, I’m back to my lighter work schedule and I will be out building as much as possible!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Quotes

"It takes as much energy to wish as it does to plan." - Eleanor Roosevelt

"It is not because things are difficult that we do not dare. It is because we do not dare that they are difficult." - Seneca

"Have nothing in your house that you do not know to be useful or believe to be beautiful." - William Morris
%d bloggers like this: