I had Thursday off and was out working on the house bright and early! Dylan was at work, but with his best friend’s help (who happens to live a few houses over), I cut and test-fitted that final odd piece.

IMG_1070.JPG

It’s so much easier to move and cut plywood when you have someone to help lift and hold.

Then we put up the first 4 notched pieces on the far side:

IMG_1072

IMG_1074

First piece!

IMG_1076.JPG

I had to break for some midday plans, then after supper I worked on getting more pieces up with Dylan. My goal for the day was to get all 12 pieces up, but we were getting pretty cranky working on piece #10 at 9pm. When you’re snapping at each other, it’s probably time to call it quits for the day and go get some ice cream, which is exactly what we did. 🙂

We got that whole side done though:

IMG_1079

I dropped Dylan off at work on Friday morning and considered working on the house or going back to bed before my shift at 3pm. I ended up staying up, cleaning the kitchen, making myself eggs and bacon, and getting a message from Dylan’s best friend, T.O., saying he was available to help. So I decided I could get the last two pieces up before work, and we did, plus a small piece on the front wall, and we even rough cut the piece for the end wall.

IMG_1081

I don’t think anyone else can comprehend how beautiful I find this. I’m SO proud!

IMG_1080

The full piece was too heavy for the two of us to safely get up to test fit though, so we cleaned up for the day in time for my shift. I was pretty happy for the progress on an unplanned build day. It also meant that I didn’t have to take time out of my Saturday building to finish Thursday’s work. But Saturday’s plans did end up changing… Dylan and T.O. were both around and willing to help, so we finished the last two big pieces of the plywood!

Before that though, I was doing a bit of research about skylights, and checked my receipt to see if I had curb-mounted or deck-mounted ones, and my receipt said curb-mounted. As I was reading about the differences, I was getting more and more angry, because based on the descriptions, I knew I had asked for deck-mounted which are easier to install and won’t stick up as high. I was on the verge of having a fit, thinking about having to go back to the store AGAIN to yell at this man about windows AGAIN. I ran outside barefoot in my pajamas to check the skylights in the garage – which I picked up last week:

IMG_1044

and the boxes read, “Deck Mounted Skylight”:

IMG_1045

I calmed down a bit, but continued fuming a little bit that this person, who has apparently been in charge of ordering windows for decades, cannot do his job properly!

I refocused and got ready to work on the house. I wasn’t too concerned about getting the end walls sheathed before the roof; I figured I could do them after the roof sheathing, but since I had people to help I figured I might as well take advantage of it!

We test-fitted the piece I’d cut a notch in for the end wall, and it fit on the first try, so we traced the angles onto the piece while it was up there:

20160604_120929

20160604_122208

This piece was ridiculously easy. 🙂

20160604_151255

I finally have a back wall!

20160604_151313

The front wall took a bit more thought. The other walls were big and simple, so planning the plywood was easy. But the front wall is special. The lower level is just over 4′ wide, which means that you can only get one piece from a full 4×8 sheet. And nowhere on the wall is a convenient place to add blocking, so I was hoping that going 4′ up, then to the top of the first level, then up another 4′ would work, but with the ridge beam added…

20160604_161118

That’s not quite enough plywood…

So I’ll have to add a little notched piece and put some blocking behind the gap, but all the big pieces are UP! 😀 We finished this piece right before I had to get ready for work, and we used the rest of the glue. We actually ran out of glue with only a few short studs left to do, so we used a piece of scrap wood and scraped any excess glue to where it was needed. 😛

20160604_161149

So pretty!

I also got a lot of little things done recently. Dylan and I…

  • spray-painted the exposed porch hardware underneath
  • taped up the wire for the lights on the trailer where it got pinched the first time it was moved
  • scraped some solidified glue off from between a stud and the plywood, then nailed the plywood in tight again
  • trimmed some plywood edges where they were sticking out too far
  • bought ice and water shield for the roof
  • bought wood for the fascia
  • bought more L brackets for the small loft beams
  • returned the rafter ties that I didn’t use
  • bought more adhesive to use for the roof sheathing ($72!)

I am loving getting stuff done! I seem to be better at resisting the urge to go back to bed or otherwise procrastinate because it’s so exciting now that things are happening faster. I am getting this done, even while working two jobs!

Check back for my post about the tiny houses Dylan and I got to see. 🙂

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

Quotes

"It takes as much energy to wish as it does to plan." - Eleanor Roosevelt

"It is not because things are difficult that we do not dare. It is because we do not dare that they are difficult." - Seneca

"Have nothing in your house that you do not know to be useful or believe to be beautiful." - William Morris
%d bloggers like this: