I know I haven’t updated in a little while, but I’m here now to catch you up.
It has been a challenge to balance work with the build and everyday life. Normally, you have one job, then when you’re not at work, that’s free time. You can take the time to spend time with your significant other, your friends, and your family. You can spend time by yourself, which is quite necessary for us introverts. You can practice your hobbies, exercise, read, watch TV, go to the movies, eat 3 meals a day, and do the laundry. Even if you have a side project that you’re working on, you only work on that some of the time, while still taking time for everything else.
A tiny house build, however, can be all-consuming. I’ve jumped into a huge project with infinite unknowns and I almost never stop thinking about it. It’s a risky project, because any mistakes will have a huge affect later, so I’m constantly wondering if I’m doing everything right. I have nightmares that my roof sheathing has been ripped off and it’s raining directly into the house again. I’m still tense every time it rains!
I have two jobs, and while they’re both part time, I work weird hours and pick up extra shifts when people ask. Dylan works long days, sometimes not getting home until 8 o’clock at night after starting at 6am. So this month has not been as productive as the past two, especially since I lost my steam after dealing with the skylights.
This month I’m working 4 days on, 3 days off (unless I pick up more shifts like last week), and despite the rare consistency in my schedule, it’s been hard. I get home between 9 and 10:30 on days that I work, so keeping up with laundry and dishes and my own introvert time feels like a losing battle sometimes. Then, when I have my three days off, I don’t start building right away because I’m busy catching up on everything else, and Dylan’s usually at work. Then building gets pushed and pushed until we’re scrambling to try and get something done on the third evening. And as much as I don’t like mornings, building in the evening seems to make us very cranky.
I’m still trying to fit my life and the build into what feels like not enough time for everything. But when I get motivated, and I get out there, I run with it. Here’s what I’ve managed to squeeze in, rain, shine, morning or night:
☑ Cut the piece for the porch ceiling (but the temporary door needs to come off before we can put it up)
☑ Trimmed around the other wheel well (thanks Colby!)
☑ Cut all the blocking to fit each space. I did the first half with Colby’s help on Saturday, but we didn’t finish all the pieces. So I went back out on Sunday to do the rest and had the saw inside the tiny house while it rained.
☑ Put up the drip edge on the eaves
I originally only bought enough drip edge for the sides of the house because my roofing comes with pieces to finish the front of the house. But the guy at the hardware store insisted I needed some on the front too, so I bought some just in case. I was there buying nails, tin snips, and picking up the custom drip edge for over the wheel wells. But I should’ve stuck to what I already knew, because when I got home and tested the drip edge with the roofing piece, there’s no way I can use both, and I’m going to use the roofing piece.
☑ Measured and marked where the skylights will go
☑ Put up all the ice and water shield! It took a couple days working before and after work shifts, but it was easy and fun! I like being up on the roof, and for this, I was able to work by myself so Dylan didn’t have to get up on the roof. 😛
Right now, Dylan and I are working on fixing an issue I discovered with the ridge board, which I will explain once we fix it, and getting the blocking up, which is tedious. After that, I need to cut out the windows, do a few little things, cut A LOT of nails because they don’t seem to sell the short ones in Canada, then get the house wrap up and the skylights in! Then it’s the window and door installation, roofing, and purple trim around the windows! Now that we’re nearing the end of July, we’re going to need to get a move on!
My goal is to get the exterior of the house, with maybe the exception of the siding (staining is going to be very time-consuming) done by August 31st. My sister and I leave for a road trip on September 1st, so that’s my deadline. That said, so long as I keep working on the house as much as I can, if I don’t get everything done before that, I’m not going to beat myself up. This build can be unpredictable and so can my life. I can still work on the house into September, and I’m still considering paying to get my siding installed for me, which would only take two days. August is going to be a big month. Let’s just hope more things are as easy as the ice and water shield was!